Monday, September 9, 2019
Measured Building Areas Essay Example | Topics and Well Written Essays - 3000 words
Measured Building Areas - Essay Example Demolish and remove existing buildings Refer also to Internal Demolition & Preparation Site clearance and demolition Site levelling, aligning, excavation and fill Excavation and Fill Termite treatment, barriers, etc. Allowance for fill, backfill, crushed rock, etc. Rock and poor site ground condition etc. Retention and protection to adjacent properties Excavation for rock Blinding concrete & excavation ââ¬â allowance BUILDING WORKS Allowances plus Provisional Sums Concrete Work Insitu slabs, footings, walls etc. Concrete slab, piles & footings, reinforcement works, sand bed works & membrane Strip footings Pad footings, allowance for posts, columns, etc. Precast concrete works Minor personnels works, framings, fixures, ties, supports, linkins and propping. Samples & testing; hobs; access, temporary work; curing; work for services, other trades; shop drawings; inspections, etc Brickwork, Blockwork And Other Solid Walls Work in existing areas Masonry work in wall infillingg patching , making good; scaffold, etc Subfloor masonry & retaining walls Subfloor single skin walls with piers Subfloor cavity walls Brickworks 110mm brickwork skin of : External masonry veneer, wall cavity, solid or other commons Internal wallworks, commons Brickwork for fireplace & smoke/chimney - not needed Additional for facebrickwork - not needed Joints, links, scaffold, cleanings, etc - accomodated in above.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.